Skip to content
Small wind turbine on a UK farm

For UK landowners

Is your small wind turbine broken, underperforming, or sat idle?

You may still hold multiple years of Feed-in-Tariff entitlement. Our free guide shows you exactly what your stranded asset is worth — and what you can do about it.

Trusted Ryse Energy partner · 1,000+ G-11 installs across the UK · Edinburgh-based

Does any of this sound familiar?

  • Original manufacturer has gone out of business
  • Gearbox or generator failure — repair quote was too high
  • FiT income paused, dropped, or never reached forecast
  • No engineer in your area will touch the turbine

If one or more of these is true, your turbine is almost certainly a stranded asset — not a dead one. The FiT is still valuable. The guide walks you through how to unlock it.

What's inside

A practical, no-jargon guide for landowners.

  1. 01

    How to check your remaining Feed-in-Tariff entitlement

  2. 02

    Why pre-2013 small wind turbines fail — and what's worth saving

  3. 03

    Repower vs sell vs scrap: a clear decision framework

  4. 04

    What a Ryse Energy G-11 repower actually costs you (spoiler: nothing)

  5. 05

    Three anonymised case studies with payback timelines

From the field

Stranded assets, brought back online.

“We had written the turbine off. Access.Energy took the headache away and we still get the power.”

— Livestock farmer, Scottish Borders

Free download

Send me the Repowering Guide.

Tell us where to send it. We'll email you the PDF and follow up once if it looks like your site is a fit. No spam, no third-party sharing.

By submitting you agree to be contacted once by Access.Energy about your site. See our privacy policy.

Common questions from landowners

Prefer to talk? Tell us about your site.

Contact us