The challenge
Original turbine head had failed after a gearbox fault. Owner faced a five-figure repair bill on an asset already out of warranty, with FiT income paused.
What we did
We took ownership of the FiT entitlement, kept the existing tower and foundations after non-destructive testing, and installed a Ryse Energy G-11 head.
Outcome
Site back online within months. Landowner receives free on-site electricity for the remainder of the FiT term with zero maintenance liability.
“We had written the turbine off. Access.Energy took the headache away and we still get the power.”